Replacing your OLEDs is apart of maintenance and upkeep for any basic Wheatnet IP device, but it can be a little daunting if you've never done it before. The OLED circuit is comprised of the 1.5" or 1.27" screen (depending on your product) and an OLED driver board (optional).
Here is a document for how to replace the OLED's in your LXE console. Replacement is similar in all other devices. 

Now that you know how it's done, pick up your OLEDs from the WheatStore and get started replacing those burnt out or old dim screens today. 

    • Related Articles

    • How to install the WyPy CPU Replacement Kit

      Things To Do Before You Start Unplugging Things Your LXE must be running at least version 2.4 with OS R8 to begin this process. If your LXE is running any version under 2.4, you should update to version 2.20, which will make the appropriate file ...
    • Wheatnet-IP Blade Troubleshooting: A field service guide

      The Wheatnet-IP blade system is the backbone of our IP infrastructure and the neural network of our operational systems. To date of this article, we have released 4 blade models, each one more advanced than it's predecessor. The purpose of this ...
    • Wheatstone Series Four Television Console Manual

      This is the technical manual for the Series Four Television Console. Download here
    • How To Replace A Blade

      It's easy to replace a Blade and have it come up with the existing configuration. Every Blade backs itself up periodically to every other blade in the system. When replacing the blade, the Route Master can restore the backup config to the new device. ...
    • How To Replace A LXE CPU (Jetway)

      Disconnect the cables and move the LXE console blade from the rack and remove the lid. There are 12 screws that hold the lid in place; six on top and three on each side. Unplug the DC cable and battery backup from the Jetway assembly. Remove the ...